BOQ Quantity Supportability Review
Support for checking an existing Bill of Quantities. RFQS independently measures the stated BOQ quantities against the available drawings and source evidence to test whether they can be supported, with evidence-lineage throughout. A production-grade, claims-safe evidence service. Not certification, not legal, engineering, or expert-witness advice.
Can the quantities be supported by the drawings?
You already have a Bill of Quantities. A BOQ Review reads it for clarity and commercial risk; this service goes deeper by checking the quantities themselves: RFQS independently measures selected BOQ items against the admitted drawings, models and related documents, records the measurement basis and evidence links, and reports where quantities appear supported, unsupported, non-comparable, or not determinable. It is materially more production work than a document read. RFQS checks and supports your existing BOQ; it does not prepare or issue a new Bill of Quantities.
A traceable candidate-difference register
Each reviewed BOQ line marked supported / candidate difference / not comparable, with the measurement basis and evidence links.
Blocked, unsupported and not-determinable items recorded explicitly — missing evidence is never treated as zero.
Drawing/model references, revision set, and measurement rule captured per line — delivered offline as an Excel register plus a PDF evidence pack.
Choose by project size
Defined coverage, fixed scope. You choose the tier that fits — from a targeted sample to a full project. Native Revit / Civil 3D extraction carries a +25% surcharge (manual, script-based take-off; no paid tools).
Up to ~25 selected BOQ lines, one trade, one revision set · ~3–5 working days
One full trade or division, all its lines, up to 3 revision sets · ~5–10 working days
One package across trades, cross-trade reconciliation, up to 5 revision sets · ~10–15 working days
All trades and packages, full drawing-to-BOQ lineage map · ~20–30 working days
Mega-project or portfolio, delivered in phases · scoped before engagement
from $12,900 / phase
Fees in USD. Fixed scope, fixed fee, confirmed in writing before engagement. Mega / programme work is scoped and quoted per phase before acceptance. Reported quantities are decision-support findings, not certification.
Cost drivers
The tier is set by coverage density (how many BOQ lines are independently measured), source-data complexity (2D/PDF/CAD vs native Revit/Civil 3D), revision-trace depth, cross-trade reconciliation, and documentation rigour. As a single practitioner, larger scopes are delivered in defined phases to protect quality.
Not sure which tier?
Send your BOQ and available drawings. RFQS replies within 48 working hours with a written one-page fit-check and a recommended tier — no call, no commitment.
This is an evidence-based quantity support review, not a certification or approval of the BOQ. RFQS reports whether selected quantities appear supported, unsupported, non-comparable or not determinable from the admitted documents; any identified difference is a candidate review finding, not an accepted contractual discrepancy. Missing, excluded or unavailable evidence is never treated as a zero quantity. Reliance is limited to the documents provided at the time of review. The client remains solely responsible for final project decisions.
