FREE DOWNLOAD · V1.1
A one-page checklist to surface scope gaps, exclusions, and assumptions before signing, awarding, or accepting a contractor bid.
The RFQS Scope Starter Checklist gives clients, consultants, and contractor support teams a fast, structured way to pressure-test the scope of work before commitment. It is built around the everyday gaps that inform change orders, change-order documentation, and contract reviews — items missing from the bid, vague specs, undefined interfaces, and unstated assumptions.
Use it at the front of any contractor bid review, scope-of-work review, or pre-award checkpoint. Walk through the checklist line-by-line against the contractor’s bid package, mark gaps, and capture the questions you need answered before the contractor is awarded. It is meant to be printed, marked up, and circulated — a working document, not a deliverable.
Fit: residential, fit-out, light commercial, and small civil projects. Best paired with the RFQS Sample Cost Estimate Template (F-02) when reviewing pricing alongside scope.
What’s included
- Single-page PDF checklist (printable, US Letter)
- Categorised scope-gap checklist items: structure, envelope, MEP, finishes, externals, interfaces
- Margin column for action / owner / due date
- How-to-use note on the back of the sheet
Specifications
- Version: v1.1
- Format: PDF (US Letter, single page)
- Delivery: Emailed to your inbox in seconds
- License: Internal commercial use; do not redistribute
Enter your details on the next page and we’ll email the download link to your inbox right away. No spam — see our Privacy Policy.
Decision-support tool — not professional advice. See full Disclaimer. Issues with the free download? Contact RFQS.
